Is the Bitter Cold Causing Problems Heating Your Building?
Duke Construction used Air Energy “The Rack” ER systems to increase tenant comfort level in the space and reduce energy costs.
CASE STUDY:
CUSTOMER: Duke Construction
LOCATION: Indianapolis, IN
DESIGN SPECIFICATIONS: Duke Construction wanted the design HVAC contractor to explore new ways to upgrade the low heating efficiencies of standard unit heaters and the constant moving of these heaters in their Type 2 spec buildings.
PROBLEM: On their Type 2 buildings, Duke had always used unit heaters in their spaces for heating. As a heating system, unit heaters were not only not economical to operate; they were not providing the comfort level required by their tenants for their employees.
SOLUTION: By putting The Rack™ ER systems in the corners, they eliminated any future need to move the systems regardless of how the building space was subdivided. Along with not moving the systems, they increased the comfort level in the space and reduced the energy costs to the tenants.
In this economy – energy efficient, quality built, and affordable ventilation and air distribution products are critical to keeping building temperatures consistent and energy costs low. Duke Construction knows about cost saving The Rack™ ER Units – and now you do too.
To learn more contact the Air Energy Systems sales office at (317) 290-8500 .
The Rack™ models are available in four sizes:
- ER-130-200 : 9,000 cfm – 200,000 btu/hr
- ER-230-400 : 18,000 cfm – 400,000 btu/hr
- ER-142-400 : 16,500 cfm – 400,000 btu/hr
- ER-242-800 : 33,000 cfm – 800,000 btu/hr